• Home page
  • Development
    • Planning objectives
    • Sub-areas
      • 01 – Portikus
      • 02 – Kohlenstrasse
      • 03 – Kita Dösner Weg
      • 04 – Living on the Dösner Weg
      • 05/06 – Stadtquartier Lößniger Straße
      • 05a, 05b, 05c – DISTRICT PARK
      • 07a – Dösner Weg South
      • 08 – Kurt-Eisner-Straße
      • 09/09a – Industry an Offices south of Kurt-Eisner-Straße
      • 10 – Lokschuppen
    • Mobility concept
    • Sustainability
  • History
  • Partner
  • Contact us
  • Language
    • German
    • German (easy)
  • Menu Menu

Trade and offices

south of Kurt-Eisner-Straße

The railroad depot, which closed in 1952, and freight traffic shaped the urban area south of the Bayerischer Bahnhof for decades. Until its closure in 2001, several signal boxes and extensive track systems were located here on which freight and passenger trains were assembled. The complete dismantling of the old railroad facilities in the course of the commissioning of the City Tunnel created sufficient space for new uses and ideas. With excellent transport connections, this new district offers free development and design opportunities for business, institutions and science.

Sub-area 9

New address for innovative structures

The second section of the Kurt-Eisner-Straße development area (sub-area 9) is bordered to the west by the new planned road and to the east by the district park. With its location directly at the MDR S-Bahn station, this area benefits in particular from the excellent infrastructure.

This quarter offers excellent opportunities for the planned development of commercial and office space.

Sub-area 9a

MDR / Media City Leipzig

The current wasteland east of the MDR / Media City (sub-area 9a) will be given a completely new urban face.

Targeted development is carried out in sections as required. A group of buildings with commercial, scientific or institutional use is planned. The site is accessed from the west via Scharnhorststrasse and Steinstrasse. From the north, a new planned road and from the east, the new bridge in the extended Steinstrasse link the areas between Südvorstadt and Alter Messe.

Area (gross floor area): approx. 80,000 m²
Start of construction planned: from 2024
A project of: Stadtbau AG

  • 01 – Portico
  • 02 – Coal road
  • 03 – Dösner Weg daycare center
  • 04 – Living on Dösner Weg
  • 05/06 – Lößniger Strasse urban quarter
  • 05a, 05b, 05c – The district park
  • 07a – Dösner Weg South
  • 08 – Kurt-Eisner-Straße
  • 09/09a – Business and offices south of Kurt-Eisner-Straße
  • 10 – Engine shed

Kontakt    Impressum     Datenschutz     Compliance     Cookies

© 2025
Scroll to top