• Home page
  • Development
    • Planning objectives
    • Sub-areas
      • 01 – Portikus
      • 02 – Kohlenstrasse
      • 03 – Kita Dösner Weg
      • 04 – Living on the Dösner Weg
      • 05/06 – Stadtquartier Lößniger Straße
      • 05a, 05b, 05c – DISTRICT PARK
      • 07a – Dösner Weg South
      • 08 – Kurt-Eisner-Straße
      • 09/09a – Industry an Offices south of Kurt-Eisner-Straße
      • 10 – Lokschuppen
    • Mobility concept
    • Sustainability
  • History
  • Partner
  • Contact us
  • Language
    • German
    • German (easy)
  • Menu Menu
  • Teilgebiet 3 - Stadtraum Bayerischer Bahnhof

Dösner Weg daycare center

Bavarian Railway Station Leipzig

In addition to the railroad depot of the Bayerischer Bahnhof, which was closed in 1952, the new residential area “Straße des 18. Oktober” was built here at the beginning of the 1970s, which, along with the Leipzig University Hospital, characterizes the surrounding area. The planned future uses will enhance the entire district and bring a considerable increase in quality of life for both old and new residents.

Educational diversity

Starting at Dösner Weg (sub-area 3), a children’s daycare center with 165 places and a MusicLab, an experimental space for musicians and creative artists, are to be built. The latter is to be used as an extension of the Gewandhaus’s program for early musical education and music education. The adjoining apartment building provides accommodation for lecturers and seminar participants.

As a continuation of the urban planning competition from 2011, a workshop procedure was launched at the beginning of 2020 together with the City of Leipzig, to which 5 renowned architectural firms were invited. In May 2020, the submitted works were evaluated in several rounds by the jury consisting of administration, urban development, architecture and expert judges. The design by Snøhetta was chosen as the winner and will be pursued further.

The 3 buildings with a view of the park will be constructed in an open design and are intended to open up to the park as a place of participation.

Area (gross floor area): approx. 6,000 m²
Start of construction planned: 2025
A project of: Stadtbau AG

Visualisierung der Bebauung
  • 01 – Portico
  • 02 – Coal road
  • 03 – Dösner Weg daycare center
  • 04 – Living on Dösner Weg
  • 05/06 – Lößniger Strasse urban quarter
  • 05a, 05b, 05c – The district park
  • 07a – Dösner Weg South
  • 08 – Kurt-Eisner-Straße
  • 09/09a – Business and offices south of Kurt-Eisner-Straße
  • 10 – Engine shed

Kontakt    Impressum     Datenschutz     Compliance     Cookies

© 2025
Scroll to top